Client: MWH Treatment.
Value: £5,115,000.

Design and build the Welland Bio Power Resource Recovery (10MW) centre at Pebble Hall Farm, Theddingworth, Northamptonshire, England.

MWH Treatment engaged with Ward & Burke Construction Ltd. to design and build the Welland Bio Power Resource Recovery (10MW) centre at Pebble Hall Farm in Theddingworth Northamptonshire. The Plant will process waste wood products in the form of wood chips into Electricity.

  • The basic process requires the wood chips to be ‘Super-heated’ which allows water in a boiler to create steam.
  • This steam is then used to drive a turbine which will ultimately create the electricity.