Client: Galliford Try Infrastructure / Morrison Utility Services Joint Venture (MGJV), Thames Water.
Value: £2,640,000.

To help serve the growing commercial and residential developments in the Fleet area.

Grovefarm1-1300x700

To help serve the growing commercial and residential developments in the Fleet area, MGJV engaged with Ward and Burke Construction to design and construct a 25m diameter underground storage water tank, which upon completion, would assist in flood relief during storm conditions.
Grovefarm2-1300x700

  • The design allowed for the shaft walls to be constructed above existing ground level.
  • Through precise design and constructability, for it to be sunk to finished formation level.